Marrowgate surveys, plans, and oversees the retrofit of listed and pre-1919 buildings. The walls keep breathing, the heating bill falls by half, and the conservation officer signs it off the first time.
Old buildings fail in familiar ways, and most of the fixes made in the last twenty years made the failure slower to see. We start with what you are living with.
The damp came back after we paid to fix it.
Usually the repair sealed the wall. We find where the water really gets in, then open the wall up so it can leave.
Conservation has sent the application back twice.
We write the heritage statement and the method statements together, so the officer reads one story. Median time to consent: eleven weeks.
A heat pump quote arrived for a house that leaks fourteen kilowatts.
We cut the loss first, in the order the building can take, then size the pump to what is left. Often that is a pump half the size.
There is grant money, and it has a date on it.
We map every funding window to the work, then phase the programme so you can claim all of it before the deadline.
Five stages, and what you hold at the end of each.
You can stop after any stage and keep everything it produced. Most clients stop after the walk-through only if we tell them the building does not need us.
Walk-through
Two hours on site with a senior surveyor, a moisture meter, and a thermal camera. We walk every room, the roof void, and the cellar if there is one.
When
Week 1
Fee
1,800 pounds, fixed
You hold
A three-page letter: what we see, what worries us, and whether we are the right firm.
Survey
Thermal imaging at dawn, moisture mapping, brick and mortar samples, a pressure test, and the drawings checked against the real walls.
When
Weeks 2 to 4
Fee
From 6,400 pounds
You hold
The condition survey, sixty pages, with a plain-English summary on page one.
Options
Three routes, each costed: fabric first, fabric and heat pump, and the full programme. Every route shows what it does to the building as well as to the bill.
When
Weeks 5 and 6
Fee
3,100 pounds
You hold
The options report, and a decision meeting with your board or your household.
Consent and tender
The heritage statement, the listed building consent application, and a tender pack sent to three contractors we have worked beside before.
When
Weeks 7 to 18
Fee
From 5,200 pounds
You hold
Consent in hand, and a contract price that lands within 4 percent of the options report, as a median.
On site, and the first winter
Fortnightly visits while the work runs. We leave moisture probes in the walls and read them for a full year, so you hear about a problem from us before the building tells you.
When
Build period, plus twelve months
Fee
6 to 8 percent of works
You hold
The handover file, a year of wall readings, and a report on how the first winter went.
Try the order on an 1890 terrace.
A solid brick house, three bedrooms, gas boiler, 21,000 kilowatt hours of heat a year. Switch measures on and watch what the house does. The order matters more than the shopping list.
The walls
kWhheat the house needs each year, down percent
kWpeak heat loss on the coldest night
£rough cost of what you have switched on, 2026 prices
Heat pump: switch it on to see the size this house would need.
Risk to the brick: low. The walls can still dry out, which is how they were built to work.
Figures are typical of the forty solid-wall terraces we have surveyed, rounded, and shown for illustration. Your house gets its own numbers at the survey.
Recent engagements
Three buildings, three clients, one rule: every number below comes from meter readings after the first winter.
Ashbarrow Mill
Grade II listed, fourteen flats, riverside
A 1860 corn mill turned into flats, with a heating bill that had reached 31,000 pounds a year. We found the walls were wet from the riverside, relined them in lime and wood fibre, and sized a heat pump to a building that now leaked half as much.
-61%heat demand after the first winter
9weeks from application to listed building consent
Fenner Street Co-operative
Thirty-eight pre-1919 homes, one housing co-operative
The members had been quoted for sealed foam on every wall. We showed them the damp survey from the three houses that already had it, then phased a breathable programme across four winters to fit two grant windows.
-47%average heat demand across the street
0damp call-backs in three winters
The Grain Exchange
1902 commercial building, forty studio tenants
An owner who wanted the building to stay recognisable and the service charge to fall. We kept the shopfront and the brick faces, put the insulation inside, and rebuilt the roof void so the whole building stopped sweating in March.
EPC Bup from an F, with the facade untouched
-38%on the service charge in the first year
Who signs the drawings.
Ines Hallworth
Conservation architect
Twenty-two years on listed buildings. Writes the heritage statements, and knows which conservation officers want the long version.
Tomasz Veldkamp
Building physicist
Runs the moisture models. If he says a wall will not dry, we do not insulate it.
Rohan Pell
Retrofit coordinator
Accredited to the PAS 2035 standard. Owns the programme, the grant claims, and the tender.
Adaeze Brandt
Site surveyor
The person with the thermal camera at dawn, and the one who reads the wall probes every month.
212buildings surveyed, 64 of them listed
38wall probes still reporting, the oldest since 2016
4percent, median gap between options report and final contract price
What it costs, in order.
Walk-through
1,800pounds, fixed
Two hours on site and a three-page letter. If the building does not need us, the letter says so and the fee stays the same.
Survey and options
From 9,500pounds, fixed after the walk-through
The full condition survey and three costed routes. The walk-through fee comes off if you continue within sixty days.
Consent, tender, and site
6 to 8%of the works, capped on request
Consent applications, the tender, fortnightly visits, and a year of wall readings after handover.
Retained adviser
2,400pounds a month
For housing associations and estates with more than twenty buildings. One named partner, a quarterly review of every wall probe, and first call on grant deadlines.
Tell us about the building and what is going wrong. A partner replies within two working days, with a date, or with honest advice if we are not the right firm.
Prefer to talk? 020 7946 0153 Monday to Friday, nine to five.