Book a walk-through
A red brick building facade with arched windows

Keep the building.Lose the draught.

Marrowgate surveys, plans, and oversees the retrofit of listed and pre-1919 buildings. The walls keep breathing, the heating bill falls by half, and the conservation officer signs it off the first time.

212buildings surveyed since 2011
64of them listed, from Grade II to Grade I
11weeks, median time to listed building consent

Four calls we take most weeks.

Old buildings fail in familiar ways, and most of the fixes made in the last twenty years made the failure slower to see. We start with what you are living with.

  1. The damp came back after we paid to fix it.

    Usually the repair sealed the wall. We find where the water really gets in, then open the wall up so it can leave.

  2. Conservation has sent the application back twice.

    We write the heritage statement and the method statements together, so the officer reads one story. Median time to consent: eleven weeks.

  3. A heat pump quote arrived for a house that leaks fourteen kilowatts.

    We cut the loss first, in the order the building can take, then size the pump to what is left. Often that is a pump half the size.

  4. There is grant money, and it has a date on it.

    We map every funding window to the work, then phase the programme so you can claim all of it before the deadline.

Five stages, and what you hold at the end of each.

You can stop after any stage and keep everything it produced. Most clients stop after the walk-through only if we tell them the building does not need us.

Walk-through

Two hours on site with a senior surveyor, a moisture meter, and a thermal camera. We walk every room, the roof void, and the cellar if there is one.

When
Week 1
Fee
1,800 pounds, fixed
You hold
A three-page letter: what we see, what worries us, and whether we are the right firm.

Survey

Thermal imaging at dawn, moisture mapping, brick and mortar samples, a pressure test, and the drawings checked against the real walls.

When
Weeks 2 to 4
Fee
From 6,400 pounds
You hold
The condition survey, sixty pages, with a plain-English summary on page one.

Options

Three routes, each costed: fabric first, fabric and heat pump, and the full programme. Every route shows what it does to the building as well as to the bill.

When
Weeks 5 and 6
Fee
3,100 pounds
You hold
The options report, and a decision meeting with your board or your household.

Consent and tender

The heritage statement, the listed building consent application, and a tender pack sent to three contractors we have worked beside before.

When
Weeks 7 to 18
Fee
From 5,200 pounds
You hold
Consent in hand, and a contract price that lands within 4 percent of the options report, as a median.

On site, and the first winter

Fortnightly visits while the work runs. We leave moisture probes in the walls and read them for a full year, so you hear about a problem from us before the building tells you.

When
Build period, plus twelve months
Fee
6 to 8 percent of works
You hold
The handover file, a year of wall readings, and a report on how the first winter went.

Try the order on an 1890 terrace.

A solid brick house, three bedrooms, gas boiler, 21,000 kilowatt hours of heat a year. Switch measures on and watch what the house does. The order matters more than the shopping list.

The walls
21,000kWhheat the house needs each year, down 0 percent
13.8kWpeak heat loss on the coldest night
£0rough cost of what you have switched on, 2026 prices

Heat pump: switch it on to see the size this house would need.

Risk to the brick: low. The walls can still dry out, which is how they were built to work.

Figures are typical of the forty solid-wall terraces we have surveyed, rounded, and shown for illustration. Your house gets its own numbers at the survey.

Recent engagements

Three buildings, three clients, one rule: every number below comes from meter readings after the first winter.

A historic brick mill beside a river

Ashbarrow Mill

Grade II listed, fourteen flats, riverside

A 1860 corn mill turned into flats, with a heating bill that had reached 31,000 pounds a year. We found the walls were wet from the riverside, relined them in lime and wood fibre, and sized a heat pump to a building that now leaked half as much.

-61%heat demand after the first winter
9weeks from application to listed building consent
A vintage brick building facade seen from below

Fenner Street Co-operative

Thirty-eight pre-1919 homes, one housing co-operative

The members had been quoted for sealed foam on every wall. We showed them the damp survey from the three houses that already had it, then phased a breathable programme across four winters to fit two grant windows.

-47%average heat demand across the street
0damp call-backs in three winters
Low angle view of an old brick milling company building

The Grain Exchange

1902 commercial building, forty studio tenants

An owner who wanted the building to stay recognisable and the service charge to fall. We kept the shopfront and the brick faces, put the insulation inside, and rebuilt the roof void so the whole building stopped sweating in March.

EPC Bup from an F, with the facade untouched
-38%on the service charge in the first year

Who signs the drawings.

Ines Hallworth

Conservation architect

Twenty-two years on listed buildings. Writes the heritage statements, and knows which conservation officers want the long version.

Tomasz Veldkamp

Building physicist

Runs the moisture models. If he says a wall will not dry, we do not insulate it.

Rohan Pell

Retrofit coordinator

Accredited to the PAS 2035 standard. Owns the programme, the grant claims, and the tender.

Adaeze Brandt

Site surveyor

The person with the thermal camera at dawn, and the one who reads the wall probes every month.

212buildings surveyed, 64 of them listed
38wall probes still reporting, the oldest since 2016
4percent, median gap between options report and final contract price

What it costs, in order.

Walk-through

1,800pounds, fixed

Two hours on site and a three-page letter. If the building does not need us, the letter says so and the fee stays the same.

Survey and options

From 9,500pounds, fixed after the walk-through

The full condition survey and three costed routes. The walk-through fee comes off if you continue within sixty days.

Consent, tender, and site

6 to 8%of the works, capped on request

Consent applications, the tender, fortnightly visits, and a year of wall readings after handover.

Retained adviser

2,400pounds a month

For housing associations and estates with more than twenty buildings. One named partner, a quarterly review of every wall probe, and first call on grant deadlines.

Let us see the building.

Tell us about the building and what is going wrong. A partner replies within two working days, with a date, or with honest advice if we are not the right firm.

Prefer to talk? 020 7946 0153
Monday to Friday, nine to five.

What kind of building